image
image
image


BGFMA Technical Information:

Introduction  

Direct impact of heavier than anticipated truck loads, increased traffic volumes and extended service lives have taken their toll on America’s traditional rebar reinforced concrete bridge decks. These factors are the leading cause of structurally deficient ratings on the national bridge inventory.

Replacing a standard concrete deck with one that is lighter in weight but still strong enough to handle today’s wheel loads is a smart, cost- effective solution to increasing the live load rating of a bridge while minimizing structural repair costs. Using prefabricated bridge deck systems also accelerates construction to help reduce the traveling public’s frustration with lengthy and inconvenient traffic disruptions. This innovative construction technique is currently receiving considerable attention by many state DOT’s and the FHWA.


BGFMA PowerPoint Presentation  

Click on the image to view the Bridge Grid Flooring Manufacturers Association PowerPoint Presentation - "Prefabricated Steel Grid Bridge Decks".

If you are interested in having BGFMA do a presentation at your office, please CONTACT us.  One professional development hour (PDH Including NY and FL PE's) can be awarded for attendees.


© Copyright 2015 BGFMA All Rights Reserved

 


image