Q:
|
What is the required shear stud length for composite action?
|
A:
| In accordance with AASHTO LRFD, Section 6.10.10.1.4, shear connectors shall penetrate at least 2.0 inches into the concrete deck and have at least 2.0 inches of concrete cover over the tops. For grid reinforced concrete decks, the head of the stud must be at least 2.0” above the bottom of the grid main bar.
|
|
|